Environmental & Social Activities

Environmental Action Plan

Sanyo Global Environmental Action Plan

I. Aims and Targets for Global Promotion Items

 

Objectives

 

Indicators for assessing progress

Target for FY2008

FY2008 achievement

Self evaluation
*2

Target for FY2009

Target for FY2010

Target for
FY2011

Action

Realization of Carbon Neutral
*1

Carbon Neutral *1 achievement level

38% or more
*3

43%

70% or more

100% or more

Carbon Minus *1 rate
20% or more

 

CO2 reduction attributable to products

510 thousand tons

1 million tons
or more

1.6 million tons or more

2 million tons or more

CO2 emissions in global business activities *4

1.18 million tons

1.35 million tons
 or less

1.5 million tons
 or less

1.65 million tons
 or less

 

Make efforts to realize a status in which CO2 reduction through use of products is equivalent to CO2 output from business activities.

Achievement level of internal company-based goals for reduction of environmental impact in products/parts

100%

110%

100%

100%

100%

To reduce CO2 emissions attributable to products, develop and expand sales of energy-saving/energy-creation products.

Reduction rate of CO2 emissions per unit of production output in global business activities (as compared to the FY2006 level) *5

3% or more

2.1%

×*8

2.5% or more

5% or more

6% or more

In all business activities in Japan and overseas, improve energy-use efficiency and promote energy-creation and energy-saving.

Reduction rate of CO2 emissions per unit of production output in domestic manufacturing activities (as compared to the FY 2006 level) *5
<as compared to the FY1990 level>

2% or more
<29% or more>

1.2%
<22%>

×*8

1.5% or more
<27.5% or more>

4% or more
<35% or more>

5% or more
<38% or more>

In line with the target set by the electric/electronic industry (reduction of CO2 emissions per basic unit of production output by 35% from the FY 1990 level), improve manufacturing process efficiency and promote energy-creation and energy-saving.

Intensification of soil contamination control

Thoroughness of soil contamination control

Global land history survey completion rate: 100%

100%

Scheduled soil contamination survey completion rate: 100% *6

Scheduled soil contamination survey completion rate: 100% *6

Scheduled soil contamination survey completion rate: 100% *6

To reduce risks associated with global-level soil contamination, collect land information, conduct on-site surveys, and examine the necessity of purification.

Intensification of management of chemical substances in products

Thoroughness of management of chemical substances in products

100%

100%

100%

100%

100%

For each month’s production, do management so that full (100%) assurance is implemented for specified chemical substances in products.

Construction of global environmental management system

Construction level of global environmental management system

70% or more
*3

80%

85% or more

100%

100%

To ensure compliance and intensify risk management, construct and environmental management system for all business facilities in Japan and overseas.

II.Aims and Targets for GEMS Promotion Items

Objectives

Indicators for assessing progress

Target for FY2008

FY2008 achievement

Self evaluation
*2

Target for
FY2009

Target for FY2010

Target for FY2011

Expansion of environmentally-conscious  quality products

 

Percentage of advanced environmental products

70% or more

68.8%

×*9

80% or more

100%

 Target setting with new standards *7

Percentage of top-level environmental products

10% or more

16.1%

20% or more

Target setting with new standards

Target setting with new standards

Promotion of  environmental technology development

No. of transferable environment-related technologies developed (cumulative total since FY 2000)

56 or more

60

63 or more

66 or more

69 or more

Reduction of greenhouse gas emissions in business activities

 

Reduction rate of CO2 emissions per unit of production output (compared to FY 2006)

4% or more

2.7%

×*8

3% or more

6% or more

8% or more

Expected reduction of CO2 resulting from the implementation of energy-saving measures
(compared to FY 2006 CO2 emissions)

3.5% equivalent or more

4.1%

5.5% equivalent or more

6.5% equivalent or more

7.5% equivalent or more

Promotion of reuse and recycling of used products and parts

Recycling of collected recyclable materials (plastic) <amount recycled and used>

300 tons or more

327.4 tons

305 tons or more

405 tons or more

505 tons or more

Reduction of waste in business activities

 

Final waste disposal rate (GEMS average)

0.3% or less

0.096%

0.3% or less

0.3% or less

0.3% or less

Percentage of business location that achieved a final waste disposal rate of less than 0.5%
(other than those engaged in sales/service)

100%

100%

100%

100%

100%

Reduction of chemical substance emissions in business activities

Reduction rate of emission of substances subject to PRTR (compared to FY 1999)

85% or more

89.5%

Survey of usage conditions for chemical substances subject to regulation under major new law revisions

Gathering basic data for reduction aims and targets

Setting aims and targets for the reduction of chemical substances based on new standards

Intensification of management of chemical substances in products

Management level of chemical substances in products

100%

100 %

100%

100%

100%

Scope:
I.Global promotion items: All business facilities in Japan and overseas
II.GEMS Objectives: Integrated ISO14001-certified organizational body with SANYO Electric Co., Ltd. being the main entity.


*1 "Carbon neutral" is a term defined by Sanyo.

*2 ◎: Target achieved at least one year ahead of schedule. : Target achieved as scheduled. X: Target not achieved as scheduled.

*3 Target was revised upward during the period, as substantial over-achievement was anticipated.

*4 The 2006 CO2 emission factor specified by the Federation of Electric Power Companies of Japan (0.410kg-CO2/kWh, the value for the target base year) was used for calculating CO2 emissions in Japan. For overseas CO2 emissions however, the 2003 emission factors by country released by the Japan Electrical Manufacturers’ Association were used.

*5 The calculation of CO2 emissions per basic unit of production output for fiscal 2009-2011 was performed using CO2 emissions per basic unit of production output (= CO2 emissions ÷ [total production ÷ the Bank of Japan Corporate Goods Price Index])

*6 Still in planning

*7 Standards still being revised

*8 See page entitled, “Prevention of Global Warming in Production Process”

*9 See page entitled, “Making All Products Environmentally Conscious”

Page Top